How to build hydropower

Home/How to build hydropower/

power adjustment and generator protection of automation control panel

2017-12-12T19:48:38+00:00 By |hydro generator, hydropower accessory, installation and commissioning|

Micro hydro turbine generator automation control panel- auto power adjustment Clients from HS Dynamic Energy can choose different mode of auto power adjustment based on their requirements, as per the [...]

Grid-tied automation control panel

2017-12-12T19:37:30+00:00 By |hydropower accessory, installation and commissioning, maintenance of microhydro|

Micro hydro turbine generator automation control panel- Grid connection control panel HS Dynamic Energy offer client with three in one control panel(synchronization, protection and excitation ) and ten in one control [...]

Micro hydro power project civil works acceptance requirements

2017-12-12T18:47:03+00:00 By |Civil works of microhydro, installation and commissioning|

Micro hydro turbine generator installation acceptance requirements Micro hydro project power house parts The hydro turbine generator room should be set on the position without water immersion when rising flood. [...]

buy suitable micro water turbine generator

2017-12-14T15:45:09+00:00 By |hydro generator, hydropower project|

Micro hydropower generator Micro hydro generator/alternator specification The micro hydro generators include asynchronous generators, synchronous generator, and permanent magnet generator, and it also with carbon brush generator and brushless alternator, [...]

The function of a micro hydro turbine draft tube.

2017-12-12T11:23:28+00:00 By |Civil works of microhydro, How to build, hydro turbine|

The function of a micro hydro turbine draft tube. when the hydro turbine is installed on the downstream water level above a micro hydro turbine runner, a static vacuum will be formed [...]

project site selection of micro water power generator station

2017-12-12T11:09:31+00:00 By |Civil works of microhydro, How to build, hydropower project|

The construction of micro water power generator station- Find a good water resource Micro water power generator system requires two basic elements: one is water Flow (m3/s or liter/second); two is [...]

You have to do such civil works when you want to make a water turbine project

2017-12-12T11:11:15+00:00 By |Civil works of microhydro, How to build, hydropower project|

A micro hydro power project includes A micro hydropower turbine system includes: a water source – a continuous flow of water such as a creek, stream, waterfall, small dam or spring-fed dam, with a drop in [...]

Micro water turbine generator Parameters

2017-12-10T16:05:22+00:00 By |How to build, hydro turbine, hydropower project|

What are hydraulic Head, Flow rate and Capacity of micro water turbines? Basic working parameters of micro water turbine generator are: water Hydraulic Head and Flow rate, Rotation speed, Output capacity and Efficiency. Hydraulic Head of  micro water [...]

Your need to know turbine before making a water turbine generator at home

2017-12-12T10:23:37+00:00 By |How to build, hydro turbine|

Micro hydro power System Components Run-of-the-river microhydropower systems consist of these basic components: Water conveyance -- channel, pipeline, or pressurized pipeline (penstock) that delivers the water Turbine, pump, or waterwheel [...]